<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>udconstruct-v01</title>
    <link>https://www.udc-construct.co.uk</link>
    <description />
    <atom:link href="https://www.udc-construct.co.uk/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Rhode Island Coffee - Altrincham</title>
      <link>https://www.udc-construct.co.uk/rhode-island-coffee-altrincham</link>
      <description>&lt;p&gt;client: Rhode Island Coffee Limited&lt;p&gt;
&lt;p&gt;project: interior strip-out / fit-out of existing coffee shop&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Rhode Island Coffee Limited
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          retail
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          full interior strip-out and fit-out of existing coffee shop
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Altrincham
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          UDC were appointed to deliver the refurbishment of Rhode Island Coffee’s Altrincham branch, a well-established coffee shop that has been serving the community for 25 years. over time, the space had become tired and outdated, prompting the client to seek a fresh, brightened interior to stay competitive within Altrincham’s thriving retail and hospitality scene.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the Altrincham store was to be transformed into the flagship location for the brand, introducing a refreshed design and identity that would be carried through to future Rhode Island Coffee locations. this project was therefore pivotal in redefining the brand’s visual identity and customer experience.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the refurbishment involved a full internal strip-out and fit-out. the existing engineered timber flooring was carefully retained, sanded back to the raw timber surface, and finished with a commercial grade clear lacquer to restore its appearance and durability. the design incorporated bespoke joinery and premium materials, including wallpaper imported from the United States, which contributed to the shop’s distinctive and modern aesthetic.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the refurbishment was completed on a fast-track schedule of just four weeks. one of the primary challenges was co-ordinating multiple trades within a confined site, requiring precise sequencing and close communication to maintain workflow and meet deadlines.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          procurement was another significant hurdle due to the tight timeframe. early planning was essential, especially for key materials like the specialist wallpaper imported from the United States, which had longer lead times. timely delivery and installation were critical to avoid delays.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          while the flooring was retained, it required careful on-site treatment. the team sanded back the engineered timber flooring and applied a durable lacquer, which had to be carefully scheduled to allow proper drying and avoid interference with other trades.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project was delivered to a high standard and was very well received. the Altrincham coffee shop was transformed into a bright, contemporary and welcoming space that fully reflects Rhode Island Coffee’s refreshed brand identity. the finish was of high quality and the project was delivered on time and in line with the agreed four-week programme.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the client was very pleased with the outcome, and the store’s re-opening was a significant success. the project firmly establishes the Altrincham branch as the flagship model for future refurbishments across the brand.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/retail"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more retail case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Rhode+Island+1.png" length="1505146" type="image/png" />
      <pubDate>Wed, 12 Nov 2025 11:27:36 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/rhode-island-coffee-altrincham</guid>
      <g-custom:tags type="string">Case Study (Retail),Featured Case Study (Retail)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Rhode+Island+1.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Rhode+Island+1.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Fiddes, Dalton Ellis Campus</title>
      <link>https://www.udc-construct.co.uk/fiddes-dalton-ellis-campus</link>
      <description>&lt;p&gt;client: The University of Manchester&lt;p&gt;
&lt;p&gt;project: roof replacement / drainage improvements&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The University of Manchester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          education
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          roof replacement including insulation, drainage and rainwater goods
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £208,591
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the roof replacement at Fiddes, Dalton Ellis Residential Campus at The University of Manchester focused on addressing persistent issues affecting the student accommodation, and arising from the flat roof, including water ingress, and mould (due to condensation) over time. the aim was not only to replace the failing roof but to upgrade the entire system for better energy efficiency, resilience and long term performance.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the works involved removing the old felt roof and installing a new built up felt system, combined with a tapered insulation scheme to significantly improve thermal performance, and alter falls to the perimeter of the roof and to external drainage. the rainwater drainage system was completely redesigned, removing internal rainwater pipes and adding eight external outlets and incorporating hoppers with storm outlets and a tapered gulley design to improve water flow, and effectively eliminating risk of internal leaks. these hoppers now connect to downpipes, safely channelling rainwater to the ground level gullies. any blockages can be easily spotted and readily addressed thanks to the provision of access equipment and edge protection to the completed roof.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          other improvements included perimeter trimming in pre-finished aluminium inclusive of the extended height gables (due to the tapered insulation scheme). we also replaced the hardwood feature cladding to the projecting tank house to ensure good weathering / flashing to the new flat roof and to reduce any risk of weather bypassing the new system. as the site lies within a conservation area, all materials including heritage grade rainwater pipes and Siberian Larch timber cladding were carefully selected to meet strict compliance requirements, ensuring the finished work respected the character and appearance of the surrounding area.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the roof replacement at Fiddes presented several design and logistical challenges, including resolving technical details related to the roof build up, upstand connections and accurate positioning of the rainwater pipes. conservation restrictions meant that a standard guardrail system could not be used, so a fold away guardrail was installed to preserve the discreet visual profile of the roofline.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          working within live student accommodation added further complexity, with strict noise and time restrictions shaping the work schedule. the team prioritised keeping the roof watertight at the end of each day to protect the residents below and avoid disruption to their daily lives.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the roof replacement at Fiddes delivered a high quality, energy efficient and conservation compliant roofing solution that will serve the student accommodation for many years to come. one of the standout successes was completing the works with zero snagging issues, reflecting excellent workmanship and careful project management.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the client was highly satisfied with both the outcome and the clear, consistent communication provided by UDC. this project not only resolved long standing maintenance issues but provided a robust, modern upgrade that enhances the living environment for students while fully respecting the historic character of the site.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more education case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fiddes.png" length="2012561" type="image/png" />
      <pubDate>Mon, 26 May 2025 17:45:11 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/fiddes-dalton-ellis-campus</guid>
      <g-custom:tags type="string">Case Study (Education),Featured Case Study (Education)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fiddes.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fiddes.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Eversley Villas</title>
      <link>https://www.udc-construct.co.uk/commercial-eversley-villas</link>
      <description>&lt;p&gt;client: Kamani Global Investments Ltd&lt;p&gt;
&lt;p&gt;project: refurbishment of 3 high-end duplex apartments&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Kamani Global Investments Ltd
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          commercial
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          refurbishment of 3 high-end duplex apartments
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £1.25M
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Altrincham
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          UDC was appointed as principal contractor for the renovation of three luxury duplex apartments at Eversley Villas. the project comprised a complete mechanical and electrical redesign, significant internal reconfiguration and the delivery of high-spec finishes throughout.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          a key focus was on bespoke craftsmanship, with custom timber archways, kitchens, vanity units, shelving, walk-in wardrobes and other fitted furniture tailored to each space. one of the standout structural alterations involved the construction of a new staircase, built in-house using original treads, and fitted with new risers and strings to accommodate the revised floor levels.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          to enhance both comfort and performance, the apartments were insulated and fitted with dropped bulkhead ceilings incorporating concealed LED feature lighting. LVT flooring was laid in a herringbone pattern, and all rooms were redecorated, with the external windows also refurbished. bathrooms were completed with high-end wall tiling and formed falls to the floors to support drainage.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          new air conditioning systems, extract ventilation, and brushed bronze sanitary ware were installed, along with high-performance radiators imported from Germany. as the manufacturer did not offer the desired colour, the radiator covers were dismantled and custom-sprayed to meet the design brief.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additional works included the installation of new internal and pocket doors, bespoke aluminium glazed fire doors, antique redwood skirting and architraves, and hand-applied detailing such as bespoke door beading. decorative finishes included venetian plaster and limewash feature walls, bringing texture and warmth to the interiors. externally, the lightwells were cleaned and fitted with new lighting, entrance flagging was reinstated, and waterproofing works were carried out. the project was completed with the installation of new boilers, hot water cylinders, curtains, and blinds, ensuring every element was finished to a high standard.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project encountered several logistical and technical challenges. tight voids made M&amp;amp;E installations complex, while existing underground drainage limited reconfiguration options. additional internal tanking was required, and updates to heating regulations meant redesigning M&amp;amp;E plans to meet new FLOS standards.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          deliveries were impacted by the site’s location on a busy road near a school, and some specialist materials had long lead times. frequent design changes required clear communication with contractors, and careful planning was needed to minimise disruption to tenants above the apartments.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project was delivered to a high standard, with full adherence to all current building control regulations. bespoke features and premium finishes were successfully integrated, with coordinated trades ensuring smooth progress throughout.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client expectations were met through flexibility and attention to detail, while the revised heating system met all new regulatory requirements. the project successfully met building control regulations through meticulous compliance and attention to detail, ensuring that all aspects of the work were carried out to the highest standards.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the result is a series of beautifully finished, modernised homes that blend original character with contemporary design, showcasing Urban Design &amp;amp; Construct’s ability to deliver complex, high-end refurbishments with care and precision.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/commercial"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more commercial case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/2-bae78444.png" length="1297467" type="image/png" />
      <pubDate>Mon, 05 May 2025 19:59:55 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/commercial-eversley-villas</guid>
      <g-custom:tags type="string">Featured Case Study (Commercial),Case Study (Commercial)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/2-bae78444.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/2-bae78444.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Manchester Dogs Home (Phase 1)</title>
      <link>https://www.udc-construct.co.uk/manchester-dogs-home-phase-1</link>
      <description>&lt;p&gt;client: Manchester and District Home for Lost Dogs&lt;p&gt;
&lt;p&gt;project: internal and external upgrades&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          Manchester and District Home for Lost Dogs
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Ltd
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          commercial
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          phase 1 refurbishment, comprising internal and external upgrades
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £1.1M
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Urban Design &amp;amp; Construct was appointed to deliver the full refurbishment of a kennel block with a view to compliance to updated legislation and improvements for the dogs and the staff who maintain the kennels. additionally to re-landscape the underutilised external areas to create improved exercise areas for the dogs. it is hoped that (subject to obtaining the necessary funding), the refurbishment of the remaining blocks will follow.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           new exercise areas and the newly named
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Jackie Doggett Area
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          , a dedicated meet-and-greet space, were created with secure fencing and soft surfacing to provide safe, welcoming environments for dogs and visitors. existing green areas were enhanced with additional fencing to create secure outdoor zones. internally, the adoption building received essential repairs and upgrades, while kennel block 1 underwent a full refurbishment. this included masonry wall repairs, custom mechanical louvers, guillotine doors, cladding to internal walls, and the application of durable liquid resin flooring.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          stainless-steel kitchen units were installed to support cleanliness and improve day-to-day operations. external infrastructure improvements included a new access road, artificial grass areas, street lighting, and external stairs, all designed to improve functionality while preserving the site’s natural charm.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          d
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          elivering this phase within a live, fully operational animal care environment required careful coordination. all works had to be planned around the needs of staff, volunteers, and animals to minimise disruption. strict safety measures and noise control protocols were implemented to ensure the welfare of the dogs throughout construction.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the installation of bespoke features such as mechanical louvers, guillotine doors, and custom gates required close collaboration with specialist suppliers to ensure precision and functionality. weather delays impacted some of the external works, including fencing and road construction, requiring flexibility in scheduling. 
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          p
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           hase 1 was completed on time and to a high standard. the new exercise areas and the
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Jackie Doggett Area
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           have significantly enhanced visitor experience and improved the dogs’ daily environment. the full refurbishment of kennel block 1 has delivered noticeable improvements in hygiene and infection control, with infection rates already reduced.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the new kitchens have improved day-to-day efficiency, while the external upgrades have enhanced both the accessibility and overall presentation of the site. the use of durable, low-maintenance materials ensures the long-term performance of the improvements. this successful first phase lays a strong foundation for the next stages of the wider refurbishment, supporting the Dogs Home’s continued commitment to animal welfare and community engagement.
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/commercial"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more commercial case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Dogs+Home.png" length="1713846" type="image/png" />
      <pubDate>Sun, 04 May 2025 17:49:42 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/manchester-dogs-home-phase-1</guid>
      <g-custom:tags type="string">Featured Case Study (Commercial),Case Study (Commercial)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Dogs+Home.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Dogs+Home.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Joiner Vacancy</title>
      <link>https://www.udc-construct.co.uk/joiner-vacancy</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           job title:
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Joiner
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           location:
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           North West (site-based)
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           salary:
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           competitive salary / package
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           hours:
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           40 hours per week (flexible to business needs)
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;strong&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           contract:
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           permanent
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           are you a skilled joiner looking for your next opportunity?
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           we are looking for a highly skilled and motivated joiner to join our growing team. as part of our operations team, you’ll be responsible for delivering high-quality joinery work on a range of exciting construction projects across the North West. this is a fantastic opportunity to contribute to top-tier projects and work within a supportive, dynamic environment.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           key responsibilities:
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            perform 1st and 2nd fix joinery tasks, including making good
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            carry out dry lining and ceiling fixing where necessary
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            interpret technical drawings and site documentation to ensure accurate delivery
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            plan and organise daily tasks in collaboration with the site manager
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            maintain high standards of craftsmanship and ensure the quality of work at all stages
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ensure strict adherence to site health and safety procedures
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           what we’re looking for:
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            proven experience in the joinery trade
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            valid CSCS card (essential)
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            first aid at work certificate (desirable, but not essential)
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            a competent tradesman with a broad understanding of other trades
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            exceptional attention to detail and craftsmanship
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            self-motivated, reliable, and positive with a proactive approach to problem-solving
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            strong planning, time management, and organisational skills
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            good communication and teamwork abilities
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            basic IT skills
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            full UK/EU driving licence
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           perks of the role:
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            access to the company’s medical policy
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            pension scheme
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            opportunities for career development and training
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            20 days annual leave, plus 8 bank holidays
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           about UDC:
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           UDC is an experienced building contractor based in Salford, specialising in healthcare, education, commercial, and refurbishment projects. we take a refreshingly different approach to construction, focusing on high-quality delivery, exceptional customer care, and maintaining the highest safety standards across all our projects. our approach is client-focused, providing an ‘end-to-end’ solution that exceeds expectations.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           if you're a talented joiner seeking a rewarding and engaging role with a forward-thinking company, we’d love to hear from you!
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Joiner+Vacancy.png" length="4326786" type="image/png" />
      <pubDate>Fri, 17 Jan 2025 16:50:05 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/joiner-vacancy</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Joiner+Vacancy.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Joiner+Vacancy.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Merry Christmas from UDC</title>
      <link>https://www.udc-construct.co.uk/merry-christmas-from-udc</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           As the year draws to a close, we want to wish all our clients, partners, and team members a Merry Christmas and a prosperous New Year.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           As the year draws to a close, we want to wish all our clients, partners, and team members a Merry Christmas and a prosperous New Year.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           2024 has been an incredible year filled with achievements we’re proud of, and we’re looking forward to building on this success in 2025. Thank you for being part of our journey – your support means everything to us.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Take a look at some of our highlights from 2024 below!
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Construct+overview-379c5b02.png" length="1068741" type="image/png" />
      <pubDate>Tue, 17 Dec 2024 21:12:10 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/merry-christmas-from-udc</guid>
      <g-custom:tags type="string">what's happenning</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Construct+overview.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Construct+overview-379c5b02.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Jean McFarlane FBMH Building</title>
      <link>https://www.udc-construct.co.uk/education-jean-mcfarlane-fbmh-building</link>
      <description>&lt;p&gt;client: The University of Manchester&lt;/p&gt;
&lt;p&gt;project: refurbishment of seminar rooms&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The University of Manchester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          education
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          refurbishment of seminar rooms
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £98,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           as part of the University of Manchester's construction works framework, the refurbishment of the seminar rooms on the ground and second floors of the Jean McFarlane FBMH Building focused on modernising and upgrading these teaching facilities.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the scope of work included the installation of new, high-quality flooring to improve both durability and aesthetic appeal, as well as a full redecoration to create a fresh and contemporary atmosphere.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           bespoke joinery was integrated into the design to enhance the overall look and functionality of the rooms. advanced acoustic treatments were installed to improve sound clarity, providing an optimal learning environment.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, the electrical systems were upgraded to support cutting-edge audiovisual equipment, ensuring that the seminar rooms were fully equipped for modern teaching and presentation requirements.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           although no major issues arose during the project, several challenges had to be managed effectively to ensure the refurbishment proceeded smoothly.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           one of the main challenges was working in a live environment, as the surrounding offices within the building remained operational.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           ﻿
          &#xD;
      &lt;/span&gt;&#xD;
      
          to minimise disruptions, noisy tasks were scheduled for times when these areas were less occupied, allowing the construction work to proceed without significantly disturbing others. noise-reduction measures were also implemented to ensure minimal disturbance.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the project was completed successfully, delivering a modernised and highly functional space that met all of the client’s expectations. the new flooring and redecoration gave the seminar rooms a fresh, professional look, enhancing the environment for both students and lecturers.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the acoustic treatments greatly improved sound clarity, ensuring that the rooms were suitable for high-quality presentations and learning activities. the electrical upgrades enabled the integration of state-of-the-art audiovisual technology, providing the university with flexible and fully equipped spaces.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           ﻿
          &#xD;
      &lt;/span&gt;&#xD;
      
          this refurbishment demonstrated the importance of detailed planning and communication when working in occupied spaces and reinforced the value of flexibility and collaboration.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more education case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000307+-+Jean+McFarlane+Building-09.jpg" length="243072" type="image/jpeg" />
      <pubDate>Wed, 16 Oct 2024 12:14:45 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/education-jean-mcfarlane-fbmh-building</guid>
      <g-custom:tags type="string">Case Study (Education),Featured Case Study (Education)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000307+-+Jean+McFarlane+Building-09.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000307+-+Jean+McFarlane+Building-09.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Birchwood Medical Centre</title>
      <link>https://www.udc-construct.co.uk/birchwood-medical-centre</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: accident damage - urgent repairs &lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          accident damage - urgent repairs
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £20k
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Birchwood
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           following a car accident that caused severe damage to the masonry walls of the health centre, the client requested urgent repairs to address concerns about the building’s structural safety and to restore it to its original condition.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           ﻿
          &#xD;
      &lt;/span&gt;&#xD;
      
          prior to the accident, the affected area had been in excellent condition, having been refurbished by UDC just a few years earlier. however, the impact of the crash compromised its stability and raised safety concerns. .
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          a key challenge of this project was the limited workspace, which required meticulous planning to avoid disrupting building users. at the same time, the team had to uphold rigorous standards of safety, security, and effective management throughout both the demolition and repair phases. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the primary focus was to maintain a safe working environment for staff, patients, and visitors, as the work was carried out within a live, operational setting. securing the damaged area and restoring the building’s structural integrity were crucial for ensuring safety during and after the repair process. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          several factors contributed to the project’s complexity. the restricted workspace required careful co-ordination to maintain safety and accessibility at all times, while minimising disruptions to the health centre's daily operations added further challenges. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the project successfully restored the damaged section of the health centre to its original state.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           ﻿
          &#xD;
      &lt;/span&gt;&#xD;
      
          alongside resolving the structural issues, the repairs improved the thermal insulation of the affected area, leading to a building that is more resilient and energy-efficient.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      
          more education case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000267+Birchwood+Medical+Centre4-5741804c.jpg" length="434017" type="image/jpeg" />
      <pubDate>Mon, 14 Oct 2024 15:24:34 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/birchwood-medical-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000267+Birchwood+Medical+Centre4-5741804c.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/J000267+Birchwood+Medical+Centre4-5741804c.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Alliance Manchester Business School</title>
      <link>https://www.udc-construct.co.uk/alliance-manchester-business-school</link>
      <description>&lt;p&gt;client: The University of Manchester&lt;p&gt;
&lt;p&gt;project: wi-fi infrastructure upgrade&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The University of Manchester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          education
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          wi-fi infrastructure upgrade
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £290,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          as part of the University of Manchester's construction works framework, the AMBS (Alliance Manchester Business School) network transformation project aimed to enhance the Wi-Fi infrastructure throughout the building, from the ground floor to level 10. this involved the installation of both new and refreshed wi-fi access points, upgrading infrastructure cabling, and improving connections to the existing communications rack.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, redundant access points and cabling were removed to streamline the network and improve its efficiency. the overall goal was to create a more robust wi-fi system, improving connectivity for staff and students without causing disruption to the building’s day-to-day operations. given that the project took place in a live building, careful planning was required to ensure minimal disruption to the ongoing activities of staff, students, and the public.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          one of the key challenges in this project was working in a live and fully operational building. it was essential to minimise disruption to the building’s occupants while completing the installation. access to specific rooms presented another challenge, as some areas had security restrictions, requiring close coordination with building management.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          to minimise the impact on the university’s activities, most of the work was completed during the summer holidays or off-peak hours, when fewer students and staff were on-site. this schedule reduced disruptions and ensured public access remained unrestricted, while prioritising the safety of staff and students
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the AMBS network transformation project was successfully completed within the agreed timeframe, resulting in significantly improved wi-fi connectivity throughout the building.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the installation of new and refreshed access points has improved network coverage, providing staff and students with a more reliable and efficient wi-fi experience across all levels.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more education case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UoM-02.jpg" length="435561" type="image/jpeg" />
      <pubDate>Wed, 09 Oct 2024 16:10:45 GMT</pubDate>
      <author>steph@udc-ltd.co.uk (Steph Arber)</author>
      <guid>https://www.udc-construct.co.uk/alliance-manchester-business-school</guid>
      <g-custom:tags type="string">Case Study (Education),Featured Case Study (Education)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Aliance+Manchester+Business+School-03.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UoM-02.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Beswick Library</title>
      <link>https://www.udc-construct.co.uk/education-beswick-library</link>
      <description>&lt;p&gt;client: The East Manchester Academy&lt;p&gt;
&lt;p&gt;project: library window replacement&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The East Manchester Academy
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          education
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          library window replacement
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £50,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our team were tasked by East Manchester Library to replace a broken front window, a large double-glazed unit measuring 2965mm x 2060mm.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          on investigation, we discovered the damage was due to a silver solar-control window film, incorrectly applied to the existing glass.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the repair presented a significant challenge given the window's considerable size and height, plus its position situated over 10 feet above ground level.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           to safely address these circumstances, we arranged specialised lifting equipment for both removal and installation.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, to minimise disruption, we coordinated the project during library closure hours – and so managing subcontractor hours and availability added further logistical complexity to this quick turnaround project.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the successful replacement not only enhanced the library's aesthetics and safety but also demonstrated our versatility in handling specialised installations.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this project served as a valuable showcase of our capabilities, earning the trust of a new client seeking reliable repairs and window installation services carried out to tight deadlines.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      
          more education case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/ema001.jpg" length="439090" type="image/jpeg" />
      <pubDate>Mon, 09 Sep 2024 21:37:35 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/education-beswick-library</guid>
      <g-custom:tags type="string">Case Study (Education),Featured Case Study (Education)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/ema001.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/ema001.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Birchwood Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-birchwood-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: dilapidation reinstatement works&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           healthcare
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          dilapidation reinstatement works
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £50k
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Birchwood
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          upgrading internal space, including eight clinical consulting rooms that needed to be compliant with Care Quality Commission (CQC) standards.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this included stripping out existing fixtures, supplying and installing HTM64 compliant tap and sink basins with IPS (Integrated Plumbing System), installing new flooring and blinds, and reconfiguring internal walls to meet healthcare standards and maximise the space. 
           &#xD;
      &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          one of the main challenges of this project was working within a live health centre environment.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our team had to navigate around busy staff and patients, requiring careful coordination and scheduling to minimise disruption – it was our priority was to limit dust and noise levels to ensure they did not affect ongoing activities within the health centre while staying on track with the project timeline.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the project was a success, meeting the brief and the requirements for CQC compliance.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           we completed the work within the designated program and budget, demonstrating our commitment to delivering high-quality healthcare refurbishments efficiently and effectively.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          it was also testament to our capability for undertaking complex works in live environments while maintaining operational continuity and client satisfaction. 
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more heathcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Birchwood008.jpg" length="198800" type="image/jpeg" />
      <pubDate>Mon, 09 Sep 2024 20:00:16 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-birchwood-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Birchwood008.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Birchwood008.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Crow Wood Health Park</title>
      <link>https://www.udc-construct.co.uk/healthcare-crow-wood-health-park</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: boiler upgrade &amp; accessibility improvements&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          boiler upgrade &amp;amp; accessibility improvements
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £105,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Widnes
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this project entailed extensive upgrades to a busy clinic facility serving vulnerable patients, including a full replacement of the main boiler plant to enhance heating and domestic hot water services.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we also upgraded the BMS panel with weather compensation and external monitoring to reduce energy consumption and carbon emissions. additionally, we installed automated sliding entrance doors equipped with intercom and fire alarm connectivity to improve accessibility and emergency escape routes.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          alterations were made to the reception counter to better accommodate wheelchair users, and internal redecoration and flooring replacement were carried out.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the site is a busy clinic, sitting within a specialist children’s facility. working within a setting serving vulnerable patients required meticulous planning to avoid disruptions and ensure patient safety.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          all internal works were scheduled outside of operating hours to minimise impact, and we maintained heating and hot water services throughout the project.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our efforts resulted in reduced energy consumption and carbon emissions, enhanced accessibility, and better emergency egress capabilities.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          most importantly, the clinic's operations remained uninterrupted during the execution of works and the clinic was more comfortable, spacious and modern once we had finished the project.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case s
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           tudies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Crow+wood016.jpg" length="475976" type="image/jpeg" />
      <pubDate>Mon, 09 Sep 2024 15:48:51 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-crow-wood-health-park</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Crow+wood016.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Crow+wood016.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wath Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-wath-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: internal door replacement&lt;P&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           healthcare
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          internal door replacement
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Rotherham
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our task involved replacing multiple internal door sets within a health centre, including the removal of existing doors and frames, supply and installation of new door sets with ironmongery and architraves, and making necessary wall and flooring repairs. our team needed to address walls that had deteriorated during removal of old door sets, as well as adjusting the new door positions to match existing layouts, requiring infilling with matching carpet or vinyl. all door sets also needed to meet strict fire regulations, requiring approval from an authorised inspector.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this demanding project required out-of-hours work over several weekends due to the health centre's operational hours and distance from our base in Manchester. our experienced team also discovered asbestos, necessitating its safe removal before any works could proceed. furthermore, long lead times for door procurement added complexity to project management; however we were able to plan efficiently, and always maintain a clean and tidy internal environment for staff returning on mondays.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our committed team delivered the project quickly and efficiently, ensuring all doors met fire regulations. another happy client, and another project that reflects our commitment to high standards and timely delivery.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more heathcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Wath+Health+Centre3.jpg" length="301360" type="image/jpeg" />
      <pubDate>Mon, 09 Sep 2024 11:41:40 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-wath-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Wath+Health+Centre3.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Wath+Health+Centre3.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Littleborough Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-littleborough-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: new cycle store/parking bays &amp; internal works&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           healthcare
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          new cycle store/parking bays &amp;amp; internal works
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £117,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Littleborough
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our team secured a significant NHS PS tender for capital projects in the Oldham &amp;amp; Rochdale area. this encompassed multiple tasks, including the removal and replacement of an existing cycle store that was deteriorating. additionally, we upgraded the health centre car park by resurfacing, remarking parking bays, and installing new external signage.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we also replaced the health centre rooflights to improve ventilation and undertook an internal fit-out of a shower room for staff cyclists. furthermore, we replaced an external fire escape door with a new steel door, incorporating necessary alterations to the suspended ceiling.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           executing these projects within a live health centre environment posed several challenges. we had to ensure continuous patient safety and minimise disruption, requiring meticulous coordination of deliveries and site clearance to maintain clear access to pathways and fire escape routes.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          it was also essential to time the car park upgrades and rooflight replacements during specific operational windows, so that our team could align with health centre operations and – often unpredictable – weather conditions.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           despite the complexities, our proactive approach and effective project management ensured client satisfaction and successful completion of all tasks within the allocated time and budget.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          another happy client and a happy team!
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more heathcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/littleborough009.jpg" length="331419" type="image/jpeg" />
      <pubDate>Mon, 09 Sep 2024 10:59:59 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-littleborough-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/littleborough009.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/littleborough009.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>stadium vomitories</title>
      <link>https://www.udc-construct.co.uk/sport-leisure-stadium-vomitories</link>
      <description>client: private &amp; confidential&lt;p&gt;
project: stadium vomitory modifications&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           client:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          private &amp;amp; confidential
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          sport &amp;amp; leisure
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          stadium vomitory modifications to two stands
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           value:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          private &amp;amp; confidential
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          private &amp;amp; confidential
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the primary objective of the project was to restore two vomitories to their original dimensions. these vomitories had been widened to increase seating capacity for wheelchair users, who have since been accommodated in alternative locations within the stadium by reverting the vomitories to their original state, the project aimed to increase the seating capacity and, consequently, the potential revenue for the club. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           ﻿
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, the project included modifying one of the vomitories to make a section of the seating into a demountable structure. this change was crucial as it would allow the stadium to be reconfigured easily for concerts or other events, enhancing its versatility without compromising seating capacity or accessibility. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project encountered several challenges that required swift and effective solutions. one of the main issues was the incorrect
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          base layer model provided for the modifications. this discrepancy necessitated on-site adjustments to ensure the structural components fit correctly and met the safety standards. the team had to collaborate closely with engineers and our fabricators to modify the steel, which required quick thinking and adaptability. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          another significant challenge was the tight deadline. the modifications needed to be completed before the first game of the season, adding pressure to the project timeline. despite the unforeseen changes and the need for on-site adjustments, the team managed to stay on schedule and deliver the project on time. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          throughout the construction phase, the team also had to be highly adaptable due to numerous changes and unexpected issues with materials. they demonstrated flexibility and effective problem-solving skills to overcome these obstacles and ensure the project's success. 
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the project was successfully completed within the stipulated timeframe and met the client's expectations.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the restoration of the vomitories and the addition of extra seating increased the stadium's capacity, providing a direct boost to the club's potential revenue from ticket sales.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the implementation of a demountable structure in the east stand also enhanced the stadium's versatility, allowing for easy reconfiguration during different events.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/sport-leisure"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more sport &amp;amp; leisure case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Manchester-United-Vomitory-Alterations-14.jpg" length="402043" type="image/jpeg" />
      <pubDate>Tue, 27 Aug 2024 13:47:32 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/sport-leisure-stadium-vomitories</guid>
      <g-custom:tags type="string">Featured Case Study (Sport &amp; Leisure),Case Study (Sport &amp; Leisure)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Manchester-United-Vomitory-Alterations-14.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Manchester-United-Vomitory-Alterations-14.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Countess of Chester Hospital</title>
      <link>https://www.udc-construct.co.uk/healthcare-countess-of-chester</link>
      <description>&lt;p&gt;client: NHS Property Services
&lt;p&gt;project: office repurpose / boiler replacement / road upgrade&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          office repurpose / boiler replacement / road upgrade
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £230,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Chester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          over a period of three years, our team undertook multiple projects at Countess of Chester Hospital. this included the conversion and refurbishment of basement space within the historic 1829 building, to create new office accommodation with a kitchen. the area, previously an abandoned filing room and office space, required extensive work such as stripping down to brick, reboarding, skimming, flooring, decoration, installation of a suspended ceiling grid, and a complete kitchen fit-out. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          working within the expansive Countess of Chester site, encompassing the main hospital and various healthcare services, presented logistical complexities. the basement project was particularly challenging due to the building's age, presence of asbestos, and severe damp issues, necessitating extensive tanking work. providing a temporary boiler during the replacement ensured continuity of heating and hot water. additionally, the highway repairs required careful coordination to maintain crucial access to the hospital's main entrance.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          working consistently with the same site manager across all projects allowed us to foster strong relationships and enhance efficiency. We worked as long-term partner; with our team returning to the site for multiple projects. over this time we were able to demonstrate our commitment and the value in our familiarity with the environment. Today, we take pride in this ongoing partnership, as we continue to contribute to the hospital's operations, ensuring safety through essential repairs. 
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/countess001.jpg" length="556363" type="image/jpeg" />
      <pubDate>Fri, 02 Aug 2024 09:55:05 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-countess-of-chester</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/countess001.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/countess001.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>UDC head office</title>
      <link>https://www.udc-construct.co.uk/commercial-udc-head-office</link>
      <description>&lt;p&gt; client: Urban Design &amp; Consult&lt;p&gt;
&lt;p&gt; project: office conversion &amp; fit out&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Urban Design &amp;amp; Consult
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           commercial
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          office conversion &amp;amp; fit out
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          Salford
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          at UDC, we embarked on a transformative journey to relocate our head office to a dynamic, purpose-built space in Salford. this move had been a decade in the making and reflected our commitment to adapt and evolve in line with our expanding business needs. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the new office was designed to integrate our two businesses, Urban Design &amp;amp; Consult and Urban Design &amp;amp; Construct, under one roof. this integration aimed to enhance collaboration and efficiency across teams. the project involved converting a previously unused warehouse into a modern office environment that supports both our current operational requirements and future growth plans. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the original space was a bare, undeveloped warehouse featuring only a small office and restroom. our challenge was to transform this basic structure into a vibrant and functional workspace that could serve as the new home for UDC, featuring distinctive design elements and bespoke décor tailored to our vision. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the new office space includes modern amenities, such as spacious meeting rooms, a sleek kitchen, and a large mezzanine area, all tailored to our team’s specific needs. we designed the office to foster a "home-like" atmosphere, ensuring employee comfort during work hours. 
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project presented several challenges, particularly regarding space limitations and the need to meet our diverse needs within these constraints. each stage of the project required meticulous planning and precise execution, as there was no room for error. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          one of the unique challenges of this project was that, as the client, we had an emotional and personal investment in the outcome. the stakes were higher because it was not just a job for us; it was about creating a new home for our company. this added a layer of pressure to the project, as it was essential that the final space reflected our values, aspirations, and the unique culture of our organisation. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          balancing the need for various functional areas, such as office workspaces, meeting rooms, kitchen, restrooms, and warehouse storage, all within a limited footprint required innovative design solutions and strategic space allocation. additionally, the project needed to be completed within a tight timeline, demanding efficient coordination and collaboration among all stakeholders. combining an industrial aesthetic with a warm, welcoming workspace required careful selection of materials and finishes to strike the right balance between functionality and comfort. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          despite these challenges, our team worked closely with our own team of architects, interior designers and engineers to resolve all issues effectively. through detailed planning and close collaboration, the project was delivered on time without compromising safety standards. 
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the transformation of the warehouse into a modern, functional office space was a resounding success. the standout feature of the project was its striking aesthetic, characterised by unique and uncommon design details that set the office apart. the industrial elements were seamlessly integrated with warm, welcoming finishes, creating a space that is both functional and comfortable for our employees. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the success of the project underscored several key lessons: effective collaboration with our wider team is crucial for overcoming challenges and achieving project goals; precision in execution and meticulous attention to detail are essential for delivering excellence; and prioritising high-quality workmanship ensures complete satisfaction and leaves a lasting impression. 
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          overall, the project not only met but exceeded our expectations, providing a new home for UDC that reflects our vision and supports our future growth. 
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/commercial"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more commercial case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Site+Final-01.jpg" length="296826" type="image/jpeg" />
      <pubDate>Thu, 01 Aug 2024 16:19:05 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/commercial-udc-head-office</guid>
      <g-custom:tags type="string">Featured Case Study (Commercial),Case Study (Commercial)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC+-+Office+Fit+Out+-+After1.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Site+Final-01.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Blackpool Connect Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-blackpool-connect-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: re-roofing &amp; internal repairs&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          re-roofing and internal repairs
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           client:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £140,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Blackpool
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           a comprehensive re-roofing project for multiple flat and pitched roof areas, seven in total, that had reached the end of their lifespan, causing leaks into the building. the project included working with a mix of roofing systems, internal repairs due to water damage, plus the installation of new ceilings and a full redecoration throughout.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this project was situated in a health centre located in the heart of Blackpool, a deprived area that required a secure site environment to prevent public access. limited external space posed challenges for setting up essential facilities such as storage containers and skips, while parking restrictions added logistical complexities. working on multiple small roofs required intricate scaffolding and strict sequencing of work to ensure safety and efficiency.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          despite the challenges, we successfully completed the project with minimal inconvenience to the client. the health centre was pleased with our adherence to schedule and budget, demonstrating our commitment to delivering quality roofing solutions while prioritising client satisfaction.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Blackpool+Connect+009.jpg" length="415046" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:03:11 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-blackpool-connect-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Blackpool+Connect+009.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Blackpool+Connect+009.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>The Railway Nursery</title>
      <link>https://www.udc-construct.co.uk/education-railway-nursery</link>
      <description>&lt;p&gt;client: The Railway Nursery&lt;p&gt;
&lt;p&gt;project: house conversion &amp; repurposing&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          house conversion &amp;amp; repurposing
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          education
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          The Railway Nursery
         &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          £320,000
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Bramhall
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this unique and exciting project challenged our team with a full design and build, converting a neighboring house into an annexe for the existing nursery to accommodate more children.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           working next to an operational nursery required careful coordination to minimise noise and disruption.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           structural issues arose from the change of use, necessitating the reinforcement of floor joists to support the additional weight of children and staff.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          tasked with creating a new car park on a sloping site with poor drainage, our team delivered innovative solutions, including the installation of permeable tarmac for adequate drainage.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the client was delighted with the completed works. this project was particularly rewarding, as it helped enhance a local business's service and provided the children of Bramhall with a safe and exceptional facility for their formative years.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/education"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more education case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Railway002.jpg" length="635878" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:03:06 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/education-railway-nursery</guid>
      <g-custom:tags type="string">Case Study (Education),Featured Case Study (Education)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Railway002.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Railway002.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Great Harwood Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-great-harwood-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services
&lt;p&gt;project:  vrf upgrade &amp; internal improvements.&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £280,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           client:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          vrf upgrade &amp;amp; internal improvements
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Blackburn
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our team successfully secured a tender for a comprehensive mechanical and electrical project involving a full upgrade to the variable refrigerant flow (VRF) system throughout the building.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this included removing existing redundant services, installing new pipework, AC units, branch controllers, and associated equipment, as well as upgrading distribution boards and cabling and commissioning the new system – as the existing system was outdated and not meeting healthcare requirements.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           a significant challenge was the crane lift required to position new plant equipment on the roof, however our team managed this safely and efficiently.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          all work was conducted at night under the supervision of a dedicated site manager to minimise disruption to the live health centre. rooms where works were carried out at night had to be reinstated and ready for morning surgeries.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the completed project ensured the health centre's compliance with ventilation and heating regulations, enhancing the overall environment for patients and staff.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          despite the complexity and need for night-time work, we successfully delivered the upgrade with minimal disruption, demonstrating our commitment to operational efficiency and ensuring a happy client.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Greatharwood037.jpg" length="421688" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:02:54 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-great-harwood-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Greatharwood037.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Greatharwood037.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Retford Hospital</title>
      <link>https://www.udc-construct.co.uk/healthcare-retford-hospital</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;p&gt;
&lt;p&gt;project: internal and external repairs &amp; improvements&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          internal and external repairs &amp;amp; improvements
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £300,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Retford
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this project involved fully modernising a hospital in disrepair, including upgrading fire doors, fire alarm systems, and boilers with Building Management System (BMS) upgrades across four plant rooms. external works included removing an existing portacabin, making necessary repairs, and installing a secure new timber fence. the aim was to replace redundant systems, update outdated BMS, and reduce the hospital's energy consumption and CO2 emissions.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           working within a live hospital environment presented significant challenges, requiring out-of-hours work to minimise disruptions.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our friendly and helpful team collaborated with the client to accelerate the programme, maintaining a 24-hour site presence to ensure timely completion.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the client was thrilled with the completed works and the new look and feel of the space. our efforts also significantly improved the operational efficiency of a key hospital in the Midlands, contributing to enhanced safety and sustainability for the site.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Retford014.jpg" length="166257" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:02:50 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-retford-hospital</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Retford014.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Retford014.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Ironstone Centre Social Prescribing</title>
      <link>https://www.udc-construct.co.uk/healthcare-ironstone-centre-social-prescribing</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;/p&gt;
&lt;p&gt;project: upgrade of reception &amp; waiting area&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          upgrade of reception &amp;amp; waiting area
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £130,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Scunthorpe
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          following a successful tender, our team undertook this transformational project – focusing on a full refurbishment of the reception and waiting area. after stripping out existing banquettes, we installed stylish new seating, supplied and installed a meeting pod and meeting space, modernised the reception desk with power and data provisions, fully decorated the area, replaced the café serving counter, and supplied raised beds for internal courtyards.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          due to covid restrictions and the need to avoid public interaction, we conducted the works at night. the project also required our team to be responsible for securing the building at the end of each shift. additionally, we prioritised leaving areas clean and tidy for daytime use.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our talented and ambitious team were able to modernise the centre, allowing it to serve the local community with improved and varied services. for example, the raised beds facilitated group gardening sessions, while the updated facilities provided internet access and a dedicated meeting space, enhancing the overall functionality and appeal of the reception area.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Ironstone017.jpg" length="334783" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:02:48 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-ironstone-centre-social-prescribing</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Ironstone017.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Ironstone017.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Fitton Hill Rugby Club</title>
      <link>https://www.udc-construct.co.uk/sport-leisure-fitton-hill-rugby</link>
      <description>&lt;p&gt;client: NHSPS / Fitton Hill Bulldogs&lt;p&gt;
&lt;p&gt;project: relocation of prefabricated building&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          relocation of prefabricated building for rugby club
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          sport &amp;amp; leisure
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          NHS Property Services / Fitton Hill Bulldogs 
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £50,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;strong&gt;&#xD;
      
          Oldham
         &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our team was tasked with decommissioning and relocating a sectional building previously used as a GP surgery, in collaboration with NHSPS (NHS Property Services), who donated it to a local rugby club and charity.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our scope included dismantling, transporting, and re-assembling the building with weatherproofing.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, we reconditioned the site to satisfy local authority standards, involving safe service isolation, hazard mitigation through landscaping, and restoring the site with graded, seeded grass to match adjacent finishes.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           challenges arose due to previous vandalism and squatting, necessitating careful clearance.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the prefabricated units required dismantling and crane transportation through narrow residential roads, posing logistical and safety challenges, including high-risk crane operations and large vehicle movements in a densely populated setting.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          however, our team’s meticulous planning and coordination meant we were able navigate these obstacles successfully.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           the project's success surpassed physical tasks, allowing us to contribute meaningfully to the community.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          clearing the site enabled the charity to engage youth through rugby, reflecting our dedication to supporting charitable initiatives – we're proud to deliver not only construction services but also foster community well-being where possible.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/sport-leisure"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more sport &amp;amp; leisure case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fitton+Rugby006.jpg" length="622544" type="image/jpeg" />
      <pubDate>Tue, 30 Apr 2024 12:02:43 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/sport-leisure-fitton-hill-rugby</guid>
      <g-custom:tags type="string">Featured Case Study (Sport &amp; Leisure),Case Study (Sport &amp; Leisure)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fitton+Rugby006.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Fitton+Rugby006.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Moss Side Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-moss-side-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services
&lt;p&gt;project: window and entrance door replacement&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/what-weve-done"&gt;&#xD;
      
          back to healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           NHS Property Services
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          pharmacy window and entrance door replacement
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £12,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Moss Side
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          for this project, our team transformed the look of the building by supplying and installing three new uPVC windows and replacing the existing external entrance door set – with a modern glass reinforced plastic (GRP) doorset. additionally, we stripped existing timber cladding and installed new uPVC cladding below the windows to enhance the building's aesthetics and insulation.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          as we were replacing windows during the pharmacy’s working hours, the project required careful coordination to avoid disruptions. we scheduled the door replacement for the weekend when the pharmacy was closed to ensure security. we also encountered unexpected issues with loose bricks around the existing brick opening, requiring immediate attention to secure the area – which our team did safely and efficiently.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the completed project resulted in a more insulated, secure, and visually appealing building. the client was impressed with the improvements made – and, once again, our talented team were able to provide a better environment and enhanced functionality for both staff and customers.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      
          more healthcare case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6425.jpg" length="499097" type="image/jpeg" />
      <pubDate>Fri, 26 Apr 2024 09:36:39 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-moss-side-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6425.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6425.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Burnley Dental Unit</title>
      <link>https://www.udc-construct.co.uk/healthcare-burnley-dental-unit</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;/p&gt;
&lt;p&gt;project: refurbishment of the Bupa Dental Care Unit&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          refurbishment of the Bupa Dental Care Unit
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £24,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Burnley
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the refurbishment at the Bupa Dental Care unit in Burnley aimed to enhance both the aesthetic and functionality of the facility.the scope of work included painting and decorating walls, making necessary joinery repairs, ceiling restoration, and replacing flooring. the dental unit displayed signs of wear and tear, with minor leaks contributing to flooring and ceiling damage.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHSPS and Bupa Dental Care requested that the work be conducted exclusively during weekends and outside of regular working hours, to avoid disrupting the clinic’s operations. the primary objective was to create a more welcoming and professional environment for patients whilst ensuring no interruptions to the dental practice’s daily operations.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          one of the main challenges of the project was adhering to the strict scheduling requirements, as all work had to be completed outside of regular business hours and over weekends. this required careful planning to ensure that every phase of the refurbishment was completed by the end of the workday so the clinic could open seamlessly the following morning.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          ensuring the practice remained fully operational during weekdays required excellent time management, with no room for overruns or delays. timely execution was crucial to ensuring the clinic’s staff and patients experienced no disruptions.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the refurbishment of the Bupa Dental Care unit was completed successfully, with all planned work finished on time and within the designated timeframes. the dental practice was able to resume operations each day without any interruptions, allowing both staff and patients to continue their routines unaffected by the ongoing work. the project resulted in a fully refurbished and aesthetically enhanced clinic that created a more welcoming and professional atmosphere for patients.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the success of the refurbishment highlighted the importance of efficient time management, detailed planning, and the ability to adapt to challenges as they arose. open communication with the client and close co-ordination between all trades were essential in completing the project on time and meeting the client's expectations.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6658.jpg" length="471254" type="image/jpeg" />
      <pubDate>Fri, 26 Apr 2024 09:25:52 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-burnley-dental-unit</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6658.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6658.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Alexandra Park Health Centre</title>
      <link>https://www.udc-construct.co.uk/healthcare-alexandra-park-health-centre</link>
      <description>&lt;p&gt;client: NHS Property Services
&lt;p&gt;project: physiotherapy office refurbishment&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          physiotherapy office refurbishment
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h6&gt;&#xD;
    &lt;span&gt;&#xD;
      
          New Title
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h6&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £10,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this project involved transforming an office and store into an stylish, modern, open-plan physiotherapy office. this included demolition, steelwork installation, blocking an external door, installing a new window, and a complete interior fit-out with carpet tiles, decoration, blinds, power/data installation, new lighting, and a ceiling grid.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          working within a live health centre presented significant challenges, requiring careful management to minimise dust and noise – avoiding disruptions to staff and patients while adhering to the project timeline.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the completed project delivered a clean and comfortable office space for the physiotherapy team, enabling them to effectively serve the local community and enhance patient care. our team were incredibly proud of this transformation; a remodel that resulted in a more functional, attractive and welcoming space.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6436-38087166.jpg" length="141259" type="image/jpeg" />
      <pubDate>Fri, 26 Apr 2024 08:56:02 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-alexandra-park-health-centre</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6436-38087166.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_6436-38087166.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hewitt Street</title>
      <link>https://www.udc-construct.co.uk/heritage-hewitt-street</link>
      <description>&lt;p&gt;client: Cernucci Ltd&lt;p&gt;
&lt;p&gt;project: office &amp; photography studio renovation&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          product office &amp;amp; photography studio space renovation
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          retail
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Cernucci Ltd
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £152,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Urban Design &amp;amp; Construct was tasked with transforming Cernucci's existing office space into a modern open work space studio.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our objective was twofold: to create a refreshed and inviting working environment while also establishing a designated professional photo studio to meet Cernucci's specific needs, and a separate storage area.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the first task involved stripping out the existing kitchen and toilets, followed by removing the old flooring. once the area was cleared, it allowed us to create two distinct, open spaces.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we proceeded with the installation of a new, contemporary kitchen and toilets, ensuring they met our client's standards and requirements. new flooring was then put in place, giving the entire space a modern and refreshed look.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          prioritising safety, we replaced all existing doors with new fire-resistant doors, ensuring the space adhered to fire safety regulations. the electrical supplies were updated to suit the needs of the photo studio and other operational requirements. on top of that, a new boiler was installed to effectively heat Level 1 of the converted studio.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          our team’s professional, ambitious, and solution-oriented approach successfully transformed Cernucci's ordinary office space into a vibrant photo studio complete with modern amenities, thereby meeting the client's requirements while staying on budget.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/retail"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more retail case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9154.jpg" length="411325" type="image/jpeg" />
      <pubDate>Fri, 26 Apr 2024 07:38:10 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/heritage-hewitt-street</guid>
      <g-custom:tags type="string">Featured Case Study (Heritage),Case Study (Heritage)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9154.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9154.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Brunswick Church</title>
      <link>https://www.udc-construct.co.uk/sport-leisure-brunswick-church</link>
      <description>&lt;p&gt;client: Brunswick Parish Church&lt;p&gt;
&lt;p&gt;project: roof replacement &amp; interior upgrade&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          roof replacement &amp;amp; interior upgrade
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          sport &amp;amp; leisure
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Brunswick Parish Church (Christ Church)
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £85,000
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Urban Design and Construct efficiently handled both the roof replacement and interior renovation of Brunswick Church's lounge, installing a new low - level insulated roof and the room underwent a complete decoration.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          one of the major challenges encountered was ensuring the building remained watertight during the roof stripping process.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          additionally, the church was actively using other areas while work was being carried out in the lounge, necessitating minimal noise and scheduling disruptive tasks in the early morning before members of the church community arrived.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          this successful project highlights Urban Design and Construct's commitment to attention to detail, problem-solving abilities, and transparent communication throughout the construction process.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          by understanding and working collaboratively with their clients, they deliver outstanding results that exceed expectations.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/sport-leisure"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more sport &amp;amp; leisure case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9335-77423c46.jpg" length="207932" type="image/jpeg" />
      <pubDate>Thu, 25 Apr 2024 23:54:09 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/sport-leisure-brunswick-church</guid>
      <g-custom:tags type="string">Featured Case Study (Sport &amp; Leisure),Case Study (Sport &amp; Leisure)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9335-77423c46.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/KRF_9335-77423c46.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Tilstone Lodge</title>
      <link>https://www.udc-construct.co.uk/heritage-tilstone-lodge</link>
      <description>&lt;p&gt;client: private &amp; confidential&lt;/p&gt;
&lt;p&gt;project: car port design &amp; build&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          private &amp;amp; confidential
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          heritage
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          car port design &amp;amp; build
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £40,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           location:
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Tarporley
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          UDC was tasked with designing and building a car port that offers seasonal protection whilst complementing the architectural style of a cherished heritage home. the goal was to create a structure that preserves the timeless beauty of the home whilst integrating modern functionality.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the main challenge was ensuring the car port seamlessly integrated with the heritage home's architectural style. this required careful selection of materials that matched the home’s aesthetic while ensuring durability against diverse weather conditions.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we successfully created a carport that complements the home's architectural elegance and enhances its appeal. the project showcases UDC’s dedication to quality craftsmanship, evident in the careful choice of premium materials and meticulous construction techniques. the project highlights UDC's expertise in balancing modern requirements with historical preservation, offering bespoke solutions that uphold and enrich architectural integrity.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/heritage"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more heritage case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Housing-Tilstone-Lodge-10.jpg" length="488244" type="image/jpeg" />
      <pubDate>Thu, 25 Apr 2024 21:28:50 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/heritage-tilstone-lodge</guid>
      <g-custom:tags type="string">Featured Case Study (Heritage),Case Study (Heritage)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Housing-Tilstone-Lodge-10.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Housing-Tilstone-Lodge-10.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>The Quick Brown Fox Bar</title>
      <link>https://www.udc-construct.co.uk/the-quick-brown-fox-bar</link>
      <description>&lt;p&gt;client: The Quick Brown Fox&lt;/p&gt;
&lt;p&gt;project: bar fit-out and refurbishment&lt;/p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The Quick Brown Fox
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          retail
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          bar fit-out and refurbishment at The Quick Brown Fox's new Manchester location
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £40,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Manchester
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Urban Design &amp;amp; Construct was appointed to deliver a full bar fit-out for The Quick Brown Fox at their new Manchester location. known for serving some of the finest ales in the North West, the client envisioned a space that reflected their character: rustic, warm, and inviting, with a focus on customer experience.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the project involved both remedial works to the existing building and a full internal and external fit-out. UDC worked closely with the client to transform the premises into a vibrant new venue, using the relocation as an opportunity to translate their brand into a new space. the layout and design were tailored to support the bar’s 24 taps, ensuring both operational efficiency and visual appeal. finishes, materials, and detailing were carefully selected to reflect the desired atmosphere and maintain the brand’s identity.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          working within an existing structure required careful attention to inherited conditions and existing services. remedial works were carried out to ensure the space was safe, functional, and ready to accommodate the full fit-out. coordinating works in a tight timeframe ahead of the client’s opening date required close collaboration with suppliers and trades.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          The Quick Brown Fox’s new bar was completed on time and transformed into a welcoming venue with character and charm. the fit-out reflects the brand’s identity while elevating the customer experience. UDC worked closely with the client to ensure every detail supported their vision. from layout to finish, the result is a space that proudly showcases their range of ales and delivers an environment their customers can enjoy.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/retail"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more retail case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-The-Quick-Brown-Fox-01.jpg" length="379902" type="image/jpeg" />
      <pubDate>Thu, 25 Apr 2024 21:13:58 GMT</pubDate>
      <author>stuart@dzinr.com (Stuart Gerrard)</author>
      <guid>https://www.udc-construct.co.uk/the-quick-brown-fox-bar</guid>
      <g-custom:tags type="string">Case Study (Retail),Featured Case Study (Retail)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-The-Quick-Brown-Fox-01.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-The-Quick-Brown-Fox-01.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Antala Head Office</title>
      <link>https://www.udc-construct.co.uk/industrial-antala-head-office</link>
      <description>&lt;p&gt;client: Antala Ltd&lt;/p&gt;
&lt;p&gt;project: 3 floor office block construction &amp; fit out&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Antala Ltd
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          industrial
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          construction of 3 floor office block and fit out
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £650,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Denton
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           a fully bespoke design and build project that would create new premises for a growing company by transforming two adjacent empty warehouses.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the first was developed into a three-floor office block featuring open-plan spaces, a staff kitchen, changing rooms, toilets, and a laboratory. The remaining warehouse was fitted with new lighting, heating systems, and a service bay.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          building a two-storey structure within an existing warehouse posed unique challenges, including lifting concrete floors with a crane under height constraints and meeting a tight client schedule.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our priority was to collaborate closely with the client throughout, accommodating their evolving interior design preferences tailored to a multi-generational family business.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we worked proactively to ensure the final design reflected the needs and vision of different generations within the family.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           our clients were thrilled with the result of this major design and build project.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
           it involved coordinating multiple trades and disciplines, making it a challenging yet rewarding endeavour for our team.
          &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          we take immense pride in delivering projects that exceed expectations and providing spaces our clients can truly be proud of.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/industrial"&gt;&#xD;
      
          more industrial case studies
         &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Antala-Office-Construction-11.jpg" length="297936" type="image/jpeg" />
      <pubDate>Thu, 25 Apr 2024 21:02:26 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/industrial-antala-head-office</guid>
      <g-custom:tags type="string">Case Study (Industrial),Featured Case Study (Industrial)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Antala-Office-Construction-11.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-Antala-Office-Construction-11.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Family Support Unit</title>
      <link>https://www.udc-construct.co.uk/healthcare-family-support-unit</link>
      <description>&lt;p&gt;client: NHS Property Services&lt;/p&gt;
&lt;p&gt;project: creation of sensory garden&lt;p&gt;</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          client:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          NHS Property Services
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
          healthcare
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          project:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          creation of sensory garden
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          value:
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          £35,000
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          location:
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          Wythenshawe
         &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          scope of work
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          UDC was tasked with designing and constructing a new sensory garden for Manchester University NHS Foundation Trust’s short break facility. the garden needed to offer a variety of floor surfaces to enhance sensory experiences for its users. after developing the design, it was submitted for approval before construction could begin.
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          challenges faced
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          designing the garden to meet the clients’ diverse needs was a key challenge. ensuring that these varied surfaces were functional, safe, and easy to maintain added complexity. the approval process involved detailed consultations to meet health and safety standards.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;&#xD;
      
          outcome
         &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
          the sensory garden was successfully completed, featuring a mix of floor surfaces which provided a range of tactile experiences. following approval and careful construction, the garden was well-received by users and staff, enhancing the therapeutic environment of the short break facility. the design integrated smoothly with the existing space, creating a cohesive and inviting outdoor area.
          &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="/healthcare"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
           more healthcare case studies
          &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-144-Sensory-Garden-06.jpg" length="458098" type="image/jpeg" />
      <pubDate>Thu, 25 Apr 2024 18:55:14 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/healthcare-family-support-unit</guid>
      <g-custom:tags type="string">Featured Case Study (Healthcare),Case Study (Healthcare)</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-144-Sensory-Garden-06.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-144-Sensory-Garden-06.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Building on Excellence: Saying Farewell to Armitage Construction</title>
      <link>https://www.udc-construct.co.uk/building-on-excellence-saying-farewell-to-armitage-construction</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           After a remarkable 150 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           years in the construction industry, Armitage Construction has made the decision to bid farewell once their outstanding obligations are settled.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We recognise the impact Armitage Construction has had on the construction landscape, and we wish Daniel all the best in his retirement.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We are delighted to pick up where Armitage Construction left off. We are dedicated to upholding the same high standard, sharing the same values and dedication that they became so well known for:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            client satisfaction
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            meticulous attention to detail
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            unwavering commitment
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            delivery of exceptional results 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            forging strong partnerships 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            creating innovative and sustainable spaces that inspire and excite 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            open communication and trust
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           UDC are pleased to be operating from Armitage Construction's premises in Generation House, Ancoats. This helps to ensure a seamless transition and we have also welcomed several key personnel formerly of Armitage, who have played a pivotal role in delivering Armitage’s quality construction projects. Their expertise and dedication will continue to shine through as we maintain the same level of personal attention and unwavering commitment Armitage Construction was known for.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           As we undertake this exciting new chapter we look forward to exceeding your expectations and delivering exceptional results – every step of the way.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Generation+House+-+Ancoats.png" length="5216800" type="image/png" />
      <pubDate>Tue, 16 Jan 2024 13:21:43 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/building-on-excellence-saying-farewell-to-armitage-construction</guid>
      <g-custom:tags type="string">what's happenning</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Generation+House+-+Ancoats.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Generation+House+-+Ancoats.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>UDC awarded Constructionline Gold membership.</title>
      <link>https://www.udc-construct.co.uk/udc-awarded-constructionline-gold-membership</link>
      <description>Our clients can be further reassured of our high standards.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           UDC are delighted to confirm that we have just been awarded Gold Level Membership of Constructionline.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           As an accredited member, our existing and prospective clients can be further reassured of our high level of professional competence and standards.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Having been pre-evaluated at such a high level gives our public and private sector clients confidence in appointing us to bring their projects to fruition. UDC have been members of Constructionline since 2018 and our continued and enhanced membership is a terrific achievement for ever expanding team, and demonstrative of our continual drive to excellence.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Please contact us to discuss further, we would be delighted to support your forthcoming projects.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Constructionline-Gold.png" length="232012" type="image/png" />
      <pubDate>Sat, 30 Jul 2022 18:30:55 GMT</pubDate>
      <guid>https://www.udc-construct.co.uk/udc-awarded-constructionline-gold-membership</guid>
      <g-custom:tags type="string">what's happenning</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Constructionline-Gold.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/Constructionline-Gold.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>UDC is a member of the prompt payment code</title>
      <link>https://www.udc-construct.co.uk/prompt-payment-code</link>
      <description>UDC promises good practices, including prompt supplier payments.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           UDC is a signatory to the Prompt Payment Code. As an approved signatory, UDC promises to continue to honour the following:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Pay Suppliers on Time
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            within the terms agreed at the outset of the contract
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            without attempting to change payment terms retrospectively
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            without changing practice on length of payment for smaller companies on unreasonable grounds
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Give Clear Guidance to Suppliers
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            providing suppliers with clear and easily accessible guidance on payment procedures
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ensuring there is a system for dealing with complaints and disputes which is communicated to suppliers
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             ﻿
            &#xD;
        &lt;/span&gt;&#xD;
        
            advising them promptly if there is any reason why an invoice will not be paid to the agreed terms
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Encourage Good Practice
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            by requesting that lead suppliers encourage adoption of the code throughout their own supply chains
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Please do not hesitate to get in touch by calling 0845 468 0250 or email info@udc-ltd.co.uk to discuss your requirements.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-prompt-payment-code.jpg" length="165418" type="image/jpeg" />
      <pubDate>Fri, 29 Jul 2022 17:55:18 GMT</pubDate>
      <author>stuart@dzinr.com (Stuart Gerrard)</author>
      <guid>https://www.udc-construct.co.uk/prompt-payment-code</guid>
      <g-custom:tags type="string">what's happenning</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-prompt-payment-code.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/701ed505/dms3rep/multi/UDC-prompt-payment-code.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
